Governance & Compliance · Design Review & Authority Approvals

Approved before it is admired.

Welcome to the Review Lab — where drawings are cross-examined under the light table until code, cost and constructability agree, and approvals arrive on the first submission.

The Review Lab · every line is cross-examined

The solution

A thousand trained eyes, one honest report.

Design review at the House of Ci is a forensic discipline. We place any design — our own or a third party’s — on the light table and examine it line by line: compliance, coordination, buildability and the small print that decides whether a project glides through approval or stalls at the gate.

Because we have carried projects through municipalities, civil defense and utility authorities across the Kingdom and the Gulf for two decades, our reviews read the way an approver reads — so submissions return with signatures, not comment sheets.

0+

years of practice

0

linked solutions

0

cities, one house

0

accountable team

Room I · The Light Table

Every drawing takes the stand.

Six examinations, one standard — nothing leaves the lab unproven.

01

Peer design review

A senior second opinion on any design — measured, documented, diplomatically candid.

02

Code & compliance audit

Every clause checked against local codes and the authority’s current reading of them.

03

Buildability review

We read drawings the way a site foreman will — and settle the fights before they start.

04

BIM model audit

Clash detection, model hygiene and data a contractor can actually build from.

05

Value engineering

Cost taken out of the build — never out of the beauty.

06

Drawing QA/QC

Numbering, references, revisions — a set that behaves like a legal document.

Room IExhibit A — the light table, where drawings testify.

Room II · The Red Lines

Marked in red, resolved in full.

Our review is a chain of custody — every comment logged, answered and closed before anything reaches an authority.

01

Receive

The set is logged, versioned and frozen — review begins from one source of truth.

02

Examine

Specialists sweep the set in parallel — structure, MEP, fire, finishes, cost.

03

Mark

Red lines with reasons — every comment cites the clause or the clash behind it.

04

Resolve

We sit with the design team until every red line has an answer, not an excuse.

05

Re-check

Corrected sheets return to the table — nothing is closed on trust.

06

Certify

A signed review report — ready for the authority, ready for site.

Room III · The Authorities

We speak fluent approval.

Permits are a language — codes, forms, sequences and the person across the counter. The House of Ci has spoken it for twenty years.

01

Municipality permits

Building permits assembled the way reviewers want to read them.

02

Civil defense

Fire & life safety files that pass inspection on the first walk.

03

Utility authorities

Power, water, telecom — connections negotiated and scheduled early.

04

Environmental & sustainability

Clearances and ratings folded into the design, never bolted after.

05

Heritage & special districts

Sensitive-zone approvals handled with patience and precedent.

06

Completion certificates

The final signatures that turn a project into an address.

From NEOM boulevards to Riyadh towers to Dubai districts — the House of Ci has walked designs through the region’s most demanding approval rooms, in ten cities, with one accountable team.

Room IVThe Verdict — stamped, signed, unstoppable.

Luck is not a compliance strategy.

Design Review, Compliance & Authority Approvals · House of Ci

Put your design on our table.

One conversation maps your brief to the whole house — within days.