Build & Deliver · Turnkey Fit-Out & Construction

Walk in when it is perfect.

Welcome to Turnkey by the House of Ci — we take your space through dust, steel and noise, and hand it back silent, polished and ready to live. You carry only the key.

The Site & The Salon · hard hats to silk gloves

The solution

One contract. One team. One key.

Turnkey at the House of Ci means the entire journey lives under one roof — demolition, structure, MEP, joinery, stone, paint and the final cushion on the final sofa. No blame between trades, because all the trades answer to us.

You will feel two worlds on this page: the field, where our engineers command dust and steel — and the finishes room, where craftsmen in cotton gloves fit brass to marble by the millimeter. Both are the same promise: walk in when it is perfect.

20+

years of practice

19

linked solutions

10

cities, one house

1

accountable team

Room I · The Field

Where the promise is poured in concrete.

Hard hats on — this is the loud half of luxury, run with military calm.

01

Demolition & enabling

Clean strip-outs, protected neighbors, sites ready to build in days.

02

Structure & shell

Concrete, steel and block — poured, welded and inspected to the drawing.

03

MEP first fix

Every duct, tray and pipe laid before a single wall closes.

04

Site command

Our own supervisors on the slab daily — logistics, safety, sequence.

05

Façades & openings

Glass, stone and doors set plumb, sealed and weather-proven.

06

Quality gates

No trade advances until the last one passes inspection.

Room IThe Field — luxury begins as sparks and rebar.

Room II · The March

From bare slab to final polish, in order.

Turnkey lives or dies by sequence. Ours is rehearsed on every project until it feels inevitable.

01

Set out

The design transferred to the slab — lines, levels, no guesswork.

02

Close the shell

Partitions, ceilings and services signed off zone by zone.

03

Dry finishes

Stone, timber and metals fitted by the house’s own joiners.

04

Wet finishes

Paint, plaster and polish laid in dust-controlled rooms.

05

FF&E install

Furniture, art and lighting placed to the styling plan.

06

Snag to zero

A list that ends at nothing — then the deep clean and the key.

Room III · The Finishes Room

Now take the hard hat off.

This is the quiet half of luxury — where the House of Ci is fussiest, because this is the half you will touch every day.

01

Stone & marble

Slabs book-matched and dry-laid for approval before a single cut.

02

Joinery & boiserie

Paneling and cabinetry from our own workshop, fitted to the wall’s truth.

03

Metals & brass

Inlays, trims and ironmongery aligned to the millimeter.

04

Paint & plaster

Ten silent coats nobody counts — and everybody feels.

05

Textiles & leather

Upholstery, drapery and wallcoverings hung wrinkle-free, seam-true.

06

Light & scent

Scenes tuned, lamps aimed, the room’s first breath chosen.

Tower floors in Riyadh, villas on the coast, flagship suites across the Gulf — the same finishing conscience signs every room, in ten cities, with one accountable team. Office Fit-Out Riyadh →

Room IVThe Reveal — brass meets marble, and the site disappears.

The dust was ours. The first morning is yours.

Turnkey Fit-Out & Construction · House of Ci

Saudi culture, through nineteen solutions

From Diriyah and AlUla to the cultural stories of Saudi Arabia, House of Ci connects pavilion design, cultural programs, performances, hospitality, gifts and printed materials through its existing solutions.

Explore Saudi culture

Hand us the site. Take back a home.

One conversation maps your brief to the whole house — within days.

Privacy Preference Center